Vietnam Factory
Capacity per month
_ Mops: 400,000pcs
_Cloths: 300,000pcs
FTA(Free Trade Agreement) :
EU, UK, EAEU AUS/NA, IND, JPN etc
REX Declaration based on GSP
Ocean freight from Ho Chi Min port(VNSGN)
Rotterdam(NL) 30-35 days
Long Beach(US) 30-35 days
Air freight from Tan Son Nhut airport(SGN)
Worldwide 3-7days
Running own knitting machine in the factory,
we can control the knitting textile quality directly.
By knitting in-house, we can optimize the production
lead time and cost structure.
Bangladesh Factory
REX Declaration based on GSP
LDCT(Least Developed Countries Tariff)
Capacity per month
_ Mops: 500,000pcs
_Cloths: 500,000pcs
Ocean freight from Chattogram port(BDCGP)
Rotterdam(NL) 30-35 days
Long Beach(US) 35-40 days
Air freight from Dhaka airport(DAC)
Worldwide 3-7days
Long Beach(US) 30-35 days
Air freight from Tan Son Nhut airport(SGN)
Worldwide 3-7days
Running own knitting machine in the factory,
we can control the knitting textile quality directly.
By knitting in-house, we can optimize
the production lead time and cost structure.
Employees 150
Capacity per month
_ Mops: 300,000pcs
Employees 50
Capacity per month
_ Mops: 100,000pcs
_ Cloths: 200,000pcs
Capacity per month
_ Mops: 100,000pcs
_ Cloths: 500,000pcs
Automatic Overlock system
In-house Knitting process
FTA(Free Trade Agreement) : CH, ISL, AUS/NZ, SG, CHL etc
RCEP(ACEAN 10 Nations)
Ocean freight from Dalian port(CNDLC)/Shanghai(CNSHA)
Rotterdam(NL) 35-40days
Long Beach(US) 25-30days
Air freight from Dalian airport(DLC)/Shanghai(SHA)
Worldwide 3-7days
Korea Factory
Material Quality Control Center
Storing Materials
Sample work (No mass production)
Namyang is the center of quality control for the
materials sourced from in and outside of Korea,
located an hour away from the head office in Korea.
We run our material supply chain system
which is that the qualified materials by Namyang transferring
to the overseas factories in Bangladesh,
China, and Vietnam.